2019 Projects
1904 Security PFOS
Installation of new advanced water filtration system with Calgon Tanks.
1915 Loveland 29th st pump station
Fleming WWTF
Construction of new evaporative lagoon WWTF including influent pump station and building, influent metering, force main, manual bar screen, lagoon construction and lining, advanced facultative pond, flow control structure, valves and appurtenances, process and site piping, gravel access road, perimeter fence, electrical, instrumentation, and controls.